Project Management Professional PMP Exam Questions & Answers

Practice 180 free Project Management Professional PMP exam questions with answers and community-discussed explanations. Each question has its own page where you can reveal the correct answer and debate it in the comments.

All 180 questions

  1. Q1 Jake is working on a user guide for a piece of banking software. The software has so many different modules that very…
  2. Q2 You are the project manager for an industrial project where your team will be replacing several pieces of equipment in a manufacturing…
  3. Q3 Larry manages a ten-month project in his organization. During the seventh month, he receives a change request from the customer. It looks…
  4. Q4 Acceptance Test-Driven Development is different than standard Test-Driven Development. As Debra writes her code, she can expect that she will most likely…
  5. Q5 Paul’s team has twelve user stories currently in progress. His team typically averages eight user stories in progress, but two of their…
  6. Q6 Congratulations! You have finished the project work and are performing quality control. You are about to validate the scope, and management would…
  7. Q7 Eddie is working on an internet marketing company's latest campaign. His clients are trying to grow organic traffic to their site, but…
  8. Q8 Sterling is a scrum master at the Siesta Manufacturing Corporation and is working on a software development project. This project is six…
  9. Q9 Eugene is the project manager for the Orange Project, which is in its planning stage. The organization is a matrix structure and…
  10. Q10 Donald works at Gamecenter CX as a programmer. Dorothy works there as well, in the role of tester. The agile methodology that…
  11. Q11 You are the project manager for the RGR Project and you’ve worked with the project team to create the WBS. Many of…
  12. Q12 You are the project manager in your organization. Your project is part of a larger program led by Nan Gramble. Nan is…
  13. Q13 You are managing a project for your organization, and management has expressed that you will need to do a better job of…
  14. Q14 James is a very creative individual and has decided to enhance a product's features during the development phase, which he was assigned…
  15. Q15 Benjamin is a project manager for a project which is ten weeks into a fifteen-week deployment. Benjamin is concerned that this project…
  16. Q16 You are a senior project manager for your organization and stakeholders enjoy working with you as project manager. Currently, you are implementing…
  17. Q17 The management team at Aqua Blue Pools has asked Rosa, their project manager, to define the correlation between the project scope and…
  18. Q18 Ike is the project manager for Project Flint, which is in its sixth week of a twelve-week implementation, has a CPI of…
  19. Q19 Tariq is a chemical engineer at a start-up focused on creating plant-based alternatives to animal products. He and his co-workers have completed…
  20. Q20 Sal is the project manager for an agile project that is ten weeks into deployment. This project is $5,000.00 under budget and…
  21. Q21 Marcus is the senior project manager for his university's information technology department. They receive some funding. They would like to use the…
  22. Q22 Sandra is the scrum master for a project that is just starting its first iteration. During a recent meeting with stakeholders, Sandra…
  23. Q23 Paola is the project manager for a project at Bank Corporation. While reviewing a set of project reports, she notices that several…
  24. Q24 You are a project manager for your organization. Your current project has a budget of $1,250,650 and is currently 65 percent done.…
  25. Q25 You are the project manager of the Bern Update project for your organization. You are currently working with your project in quantitative…
  26. Q26 You oversee a new gaming platform that will allow multiple users to create a unique virtual playroom and compete against one another…
  27. Q27 You are a project manager for the UYT Project, and you’re working with the project team to build out the project network…
  28. Q28 You are the project manager for a large project that spans several of your organization’s sites. There are many risks identified throughout…
  29. Q29 Maria is a project manager and she is nearing the end of the GHY Project. Joseph, a project team member, reports that…
  30. Q30 John is an agile project manager, and his team utilizes Kanban as its primary system to manage projects. John loves the fast…
  31. Q31 Frances is on a project team at the Comet Corporation. The project she is working on is currently halfway through a six-month…
  32. Q32 You are a project manager for your organization and your project currently has 29 stakeholders. You’ve been informed, however, that due to…
  33. Q33 Monica is the project manager of the Cottage Project. With work and budget spread evenly, this project is scheduled to last 10…
  34. Q34 Mike is the project manager of the AQA Project for his company. His BAC is $2,345,000, and he is currently 25 percent…
  35. Q35 You have tasked Jill with creating a scope management plan for your project. After a week, Jill submits a draft of the…
  36. Q36 Consider a project manager in a startup technology company. This project manager has very little authority, works closely with the people in…
  37. Q37 Leonardo is an agile coach for a pilot project team that is looking to adopt agile methodologies. Most team members have little…
  38. Q38 You are a project manager for your organization. Your project has a BAC of $250,000 and is expected to last ten months.…
  39. Q39 You are the project manager for your organization, and you subscribe to Herzberg’s Theory of Motivation. You have created several hygiene agents…
  40. Q40 Joon is a floating project manager with his company. He tends to work with projects in their early stages, especially when they…
  41. Q41 Martina is the project manager of the Speedway Project. As she and the project team study the project management plan and its…
  42. Q42 Tate has been assigned as a cost engineer to build a parking garage near a mall. His supervisor has tasked Tate with…
  43. Q43 In Avi's organization, members of management are referred to as coaches. Avi, as a project manager, is referred to as a project…
  44. Q44 Nick is a project manager for Bag Corporation, which is planning a new project. During planning, Nick is requested to determine a…
  45. Q45 You are a scrum master for a marketing development firm and working closely with your team to bring incremental value to your…
  46. Q46 Brandon uses a standard graduated fixed-price contract for his work with Gwaltney Software. If Gwaltney charges $175 per hour if they finish…
  47. Q47 Kelly and Chris are in a heated debate over which software to use in the project. Both Kelly and Chris have good…
  48. Q48 You are meeting with Jessie, a project stakeholder with low interest and low influence. You need to account for Jessie in the…
  49. Q49 Lucas is the project manager for the Orange Project. He is explaining to his project team the importance of completing lessons learned…
  50. Q50 Stephanie uses the remaining work key performance indicator to track the progress of her project. She can expect that the remaining work…
  51. Q51 Glenda is developing a schedule for the project management plan to construct a kitchen for a local restaurant. Glenda is using the…
  52. Q52 Quincy is the scrum master for Project Ponds, nine iterations into deployment, and has a velocity of thirty-eighty story points. Rex, a…
  53. Q53 Paul is an agile practitioner on a newly created scrum team. During the backlog refinement meeting, a few of the team members…
  54. Q54 Freddy conducts a quarterly appraisal of his project stakeholders to keep his team apprised of any changes to their influence, interest, or…
  55. Q55 Heather, a scrum master for Project Z, is approached by the product owner. The product owner mentions that they have noticed Heather…
  56. Q56 Zane is a project manager at Camera Corporation and is planning a new project. During a recent stakeholder meeting, the stakeholders told…
  57. Q57 One of the responsibilities of a scrum master is to remove impediments, which will prevent the team from moving forward. All of…
  58. Q58 Your project team is working on several tasks to incorporate user stories into a new video game project. However, many of those…
  59. Q59 A ten-month project is into the fifth month and running smoothly so far. It is a complex IT project with an extremely…
  60. Q60 Jane is a project manager who utilizes an abundance of project management leadership styles to accomplish her tasks. While her default style is…
  61. Q61 Paul's team at General Products uses the Lean Product Development methodology. To increase the value, they get from his work; the team…
  62. Q62 The way that Christine’s team completes frequent releases of their product without introducing many new bugs is most likely
  63. Q63 You are a project manager for your organization. Your current project has a budget of $1,250,650 and is currently 75 percent done.…
  64. Q64 Bill started managing a project, but a pandemic forced his team to meet virtually instead of physically for an extended period. Bill's team…
  65. Q65 Ben is a project manager at Blue Corporation, which is planning a new project. While speaking with stakeholders, Ben learns that the…
  66. Q66 Cale is working with a talented business analyst named Grant. Whenever Cale assigns Grant to a project, Grant's work is exemplary, demonstrating…
  67. Q67 Alice has been chosen to lead an agile team with members in locations all over the globe. Upper management was pleased with…
  68. Q68 Jerwin is the scrum master for Project V at the World Corporation. Project V operates in several countries worldwide and is intended…
  69. Q69 Ruth is part of a team working to deploy a quality product with a deadline of Q4. Recently there have been several…
  70. Q70 Tia is the project manager for the Irvin Group, which subscribes to the agile approach to project management. Her development team is…
  71. Q71 Lindsey is a new project manager starting at your firm. She tells you that she was requested to work with the team…
  72. Q72 Your development team holds their sprint review meeting with the stakeholders and demonstrates the product increment for release. During this ceremony, one…
  73. Q73 An organization has hired Ali to teach agile methodologies to a team of developers. She plans to use a website development project…
  74. Q74 You are the project manager of a large project in your organization. Many of the stakeholders are concerned about the project's success,…
  75. Q75 The main reason that the team at Global Digital News limits their development work in progress is
  76. Q76 Julia is the project manager for a cosmetics and accessories company. One of their best-selling items is an ultra-high-grain emery board that…
  77. Q77 Ophelia is the scrum master for Project T, 9 iterations into its deployment, and has a velocity of 243 story points. A…
  78. Q78 Studying for his PMP exam, Jerome knows he must be familiar with project management terms. Sometimes, terms like project scope statement, scope…
  79. Q79 Denise was recently hired as a project manager to replace a project manager who left the organization for a new opportunity. In…
  80. Q80 You are the project manager of a hybrid project with a team that includes twelve different developers. Early in the project, you…
  81. Q81 Mike is a project manager who is a very skilled negotiator. He has honed his skills over several years and after making…
  82. Q82 Before, during and after iterations, it is of the utmost importance to include numerous touchpoints with stakeholders. Why is this so important?
  83. Q83 Bianca is the project manager for the Waterford Company and is currently working her way through procurement management processes. Who should Bianca…
  84. Q84 Verdora was assigned to the Skyview Project shortly after the COVID-19 pandemic impacted the business. As a result of the pandemic, her…
  85. Q85 Lou, about to create cost estimates for his latest project, is the project manager for the Chandler Project. Of the following responses,…
  86. Q86 Bruce has been assigned as the project manager for a virtual team that spans multiple different countries. This project is the fourth…
  87. Q87 Jenna is the project manager for her organization, and she is working with her team to create a stakeholder engagement strategy. Some…
  88. Q88 The process for applying technical and administrative direction and surveillance of implementing a project is called configuration management. Of the choices below,…
  89. Q89 Your company has a policy against accepting gifts from vendors that are worth more than $50. A vendor you do much business…
  90. Q90 Dean’s company uses ISO 9000 standards as part of its manufacturing environment. Dean has been asked to incorporate an ISO 9000 approach…
  91. Q91 Raul is the project manager for a group of medical transcriptionists. Although all the transcriptionists are billed out for the maximum available…
  92. Q92 Darnell is the project manager for a company that specializes in painting interiors. Because Darnell is a new project manager, he wants…
  93. Q93 You are the project manager of the Newton Construction Project. Your team for this project will include internal and external employees. Your…
  94. Q94 Greta is a project manager for Pellston Plastics. As part of the approach to quality control, she is working with the manufacturing…
  95. Q95 Thelma is the scrum master for Project ZZQ, which has completed six iterations, has a velocity of thirty-two story points, and is…
  96. Q96 Kelly is a project manager for Southern Fried Organization and has been working on a project for the past five months. In…
  97. Q97 Thomas is the project manager for Project Anchor, nearing completion with a CPI of .94 and an SPI of 1.01. Thomas has…
  98. Q98 Joseph has properly incorporated the agile principle of building projects around motivated team members, and he trusts them to get their work…
  99. Q99 Lili is the project manager for Project T, which is midway through its planning stage. Project T is expected to take twenty…
  100. Q100 You are the project manager of a new construction project for your organization. The project has just recently been chartered, and you’re…
  101. Q101 As the project manager for the Graham Project, Robert must create a contract for his customer. What two things must be included…
  102. Q102 Janessa is a scrum master at Shaker Corporation and recently moderated a discussion between a few developers. During the discussion, the developers…
  103. Q103 Allen must start his new construction project in Florida right away as hurricane season is fast approaching, and he is on a…
  104. Q104 Jerry wants to ensure that the level of stakeholder involvement in his project is solid at Tarth's Tarps. An excellent way to…
  105. Q105 Emily is the project manager of the GHY Project. She has hired several sellers to do a portion of the project work…
  106. Q106 Your colleague, Jesse, is away on vacation, and he left you in charge of his projects. A sudden and significant opportunity presents…
  107. Q107 As an experienced project manager, you understand the importance of gathering project requirements early in the project life cycle to ensure your…
  108. Q108 Jordan has just completed the management of a small project that included replacing computer monitors in a single department of a large…
  109. Q109 Jeron's team cast several custom anchors for a boating company as part of a six-month contract. The contract stipulated that Jeron would…
  110. Q110 Benefits realization management is marked by a process where benefits are identified, defined, linked to company strategy, delivered, and wholly realized. Benefits Realization…
  111. Q111 What is represented in the provided image?
  112. Q112 Eric is working on a project to design a new heating system for his organization's building. The heating system he intends on…
  113. Q113 As part of the project team for the Aztec Project, Simon has some questions regarding risk identification. His project manager, Jessica, explains…
  114. Q114 Jessica is the project manager for a project which has just officially begun and is scheduled to last fifteen weeks. The project…
  115. Q115 You are a project manager for the BBB Project, and you’re working with Allen, a business analyst, to determine the problems and…
  116. Q116 Shawntel is the project manager at Capone Corporation. Her latest project, the Alfonso Project, requires several project team members to complete certification…
  117. Q117 Virginia's agile coach at Snow's Watches discussed an issue with the gulf of evaluation in her new agile project. The first release…
  118. Q118 Eric’s team at Parker Industries is discussing business functionality in the backlog that is focused on improving customer satisfaction. His team ranks…
  119. Q119 Frank is the scrum master for Project Daytime, which is in its third iteration. The team is performing well. Recently a team…
  120. Q120 Ethan is the project manager for Project Addison. Ten weeks into its implementation, the project will continue for fourteen more weeks and…
  121. Q121 Angela works for a Family Credit Union, which would like customers to open new accounts online. The best example of a Minimum…
  122. Q122 Denise is a scrum master at Acme Corporation. Initial planning and high-level scoping have been completed for Project G. Denise would now…
  123. Q123 As the project manager of an agile project at Beverly Logistics, Raj wants the team to be co-located. Of the following, which…
  124. Q124 A project plan gives a baseline for several factors. The project plan does not provide a baseline for which of the following?
  125. Q125 Marty is the project manager for his organization and he is trying to garner resources for a new project. The project will…
  126. Q126 Of the following, which best describes a project sponsor's role in a functional organization during project execution activities?
  127. Q127 Jeffrey is the project manager of the OPO Project for his organization and a portion of his project will be contracted with…
  128. Q128 Tom and Nancy are project team members and they are in a heated argument about achieving quality in the project. Nancy insists…
  129. Q129 Heather is a project manager for an international banking company. Her portfolio manager, Devin, has notified her that the Board of Directors…
  130. Q130 Anya is the scrum master for Project Jot, which is in its seventh iteration. During the past three iterations, the number of…
  131. Q131 Sarah is the project manager for a mechanical engineering consulting firm. The organization has had several major projects that were completed months…
  132. Q132 You are the project manager of the ORG Project. This project is similar to the ACT Project you have completed. What method…
  133. Q133 Milly is in the closing phase of a project. She ensures all invoices are paid, contracts are closed out, and lessons learned…
  134. Q134 Nicola, a new project manager, inherits a problem when she joins a team. Namely, the product they are designing is becoming too…
  135. Q135 As the project manager for Hart Logistics, management has asked for Avi's help in choosing which projects should be implemented. Of the…
  136. Q136 Art is a veteran project manager, and he constantly has a full load of projects in various stages of completion. Art is trusted…
  137. Q137 As the project manager for her organization, Phoebe is leading a large, technical project to upgrade the manufacturing equipment in the organization.…
  138. Q138 Paulina is the scrum master for Project L, which is midway through its fifth iteration. Recently a project stakeholder approached Paulina and…
  139. Q139 Lizzy is the project manager for Project Westward, three weeks into a planned ten-week implementation and has a CPI of .99. This…
  140. Q140 Stakeholder identification is essential to effective project managers. All the following are key stakeholders on every project except for which one?
  141. Q141 Frances is the project manager for an energy company that has received bad publicity for its continued use of fracking and fossil…
  142. Q142 You have started a business for an application designed to provide project management services to other clients. As a means of gathering…
  143. Q143 Kathy is the construction manager for a multi-story skyscraper building in San Diego, California. Kathy has always used analogous estimating techniques to…
  144. Q144 Jo is the project manager for Project HAL, deploying a new help center software to support ticketing agents. While reviewing the project…
  145. Q145 You are the project manager for a local university. Joseph, one of your team members, approaches you before starting the project manager…
  146. Q146 Larry is the project manager for Project Q, which is in its ninth week of implementation, is $5,000 over budget, and has…
  147. Q147 Andrea is managing a project for a city park project. The project includes building a large-scale bridge that will connect a bike…
  148. Q148 Joey is recovering from a project which recently ended. During this project, the stakeholders continuously added deliverables to the scope in addition…
  149. Q149 Angela is a scrum master for her organization and she is working with the development team and the product owner to plan…
  150. Q150 William has a stringent budget for his team's landscaping project. Specifically, he cannot spend more than $50,000, including tax, to buy new…
  151. Q151 Beth is a scrum master at Acme Corporation and has been tasked with planning Project X. Beth is concerned that the product…
  152. Q152 Arya is the project manager for a local paper company. She has been asked to research the viability of investing in a…
  153. Q153 Raquel is the scrum master for Project CF, which is in its third iteration and has a velocity of thirty-one story points.…
  154. Q154 Frank is the project manager for Project PU, which has just completed its planning stage. Besides sharing the work breakdown structure and…
  155. Q155 Leslie is the scrum master for Project Y, which is 9 iterations into its deployment and has a velocity of 68 story…
  156. Q156 Brittany's IT project is going well. She meets with her team about once a week to review a board containing tickets that…
  157. Q157 Victoria is a project manager at Creation Corporation. While planning for her next project, she is approached by a stakeholder and asked…
  158. Q158 Killian is the project manager for an agile team that has been doing things for a long time. As early adopters of…
  159. Q159 A portion of Rowen's latest project, the Tory Project, contains some dangerous work. Her project team members could likely do the work,…
  160. Q160 Sally is a scrum master for Project X. Halfway through a sprint; she overhears two of the developers on her team arguing…
  161. Q161 Larry is a project manager on Project X and has a new team member, Kathy, joining his team. Larry must prepare a…
  162. Q162 Paulina is the project manager for Project Beehive, which is nearing its final week of implementation and is getting ready to deploy…
  163. Q163 You are the project manager for a marketing project to mail out 1,000,000 postcards to prospective customers. Rather than mail out all…
  164. Q164 You are the project manager of an IT project, and you are working with the team to calculate the project's contingency risk.…
  165. Q165 Stephanie is developing the project management plan. She has put together a detailed list of situations where the project could result in…
  166. Q166 Russell has managed a project from beginning to end. As he is close to closing the project, he looks at the business case,…
  167. Q167 You are leading a predictive software development project for your organization. Midway through the project, a programmer approaches you and lets you…
  168. Q168 Jeffrey has talked with all the appropriate people to identify the risks in his agile project at Joshua Jellybeans. The people he…
  169. Q169 Jack is a project manager for the Flutter Wing Corporation and has been leading projects there for the past seven years. Jack…
  170. Q170 Trevor is the project manager for a team of policy researchers. Instead of a peer-review system, Trevor decides that the writers of…
  171. Q171 The scrum team is working in iterations to develop an online game. The product will have three beta releases before launch. During…
  172. Q172 Project F5E is starting its planning phase and expects to run for at least ten weeks. After an initial meeting, a team…
  173. Q173 Eugene is the project manager for Atomic Corporation. While reviewing a recent project proposal, he notices that several deliverables pose a potential…
  174. Q174 You are in charge of a highly complex and multi-stakeholder implementation of new IT systems for a veterinary franchise. Although your team…
  175. Q175 The agile practice that has the most significant impact on the cost of change is
  176. Q176 As the fiscal year concludes, June considers which of her project manager powers she can use to influence her team to succeed…
  177. Q177 The primary solution to handling technical debt in an agile project is:
  178. Q178 You manage a project with a $75,000 budget, and there is no room for project expenses to go past this constraint. Your…
  179. Q179 Larissa is managing a project that is over budget and has exceeded the schedule. The project team has made several mistakes during…
  180. Q180 Michael is testing Elizabeth’s development work and he has found a few issues. Michael asks Elizabeth to join him testing at his…