All 40 questions

  1. Q1 The following parking spaces should not be included in total parking capacity except:
  2. Q2 A Fitout contractor is selecting the carpets for an airport project. To comply with extended producer responsibility, It must be consistent with:
  3. Q3 Outdoor places of respite for a healthcare project can qualify as exterior access spaces for patients if they meet the location requirements…
  4. Q4 A project team member found an answer on LEEDUser forums related to a credit implementation that his project is targeting. Can he…
  5. Q5 conducting a blower door test will help achieve which of the following credits/prerequisites?
  6. Q6 What kind of documentation is required for EA Prerequisite Minimum Energy Performance?
  7. Q7 Which of the following documents is required to achieve LT Surrounding Density and Diverse Uses credit?
  8. Q8 School project wants to Implement reverberation time mitigation strategies to all of its classrooms. Which of the following is NOT an applicable…
  9. Q9 The project team wants to calculate the total materials cost for a hospitality new construction project. The team doesn't know the actual…
  10. Q10 U.S. Environmental Protection Agency estimated that ……….. % Earth’s water is fresh water, and of that, slightly over two-thirds is trapped in…
  11. Q11 How many points project can receive if gas alternative fuel fueling facilities were installed to 2% of all parking spaces?
  12. Q12 To get 2 points, projects should achieve illuminance levels between 300 lux and 3,000 lux for regularly occupied floor area with a…
  13. Q13 A project team wants to achieve 40% reduction from baseline for Private lavatory faucets, what is the required amount to achieve that…
  14. Q14 Each ventilation system that supplies outdoor air to occupied spaces must have particle filters or air-cleaning devices that meet a minimum efficiency…
  15. Q15 Project architect wants to minimize cooling loads. Optimizing the following non-HVAC design elements can help reduce the project building’s cooling load Except:
  16. Q16 Corporate sustainability reports are required to fulfill the requirements of which of the following credits?
  17. Q17 Project team wants to target LEED Gold certification for a healthcare project. One of the requirements is to provide permenant water meters.…
  18. Q18 Which of the following programs can demonstrate the chemical inventory of a product with reference to MR Credit Building Product Disclosure and…
  19. Q19 Adjusting the floor size requirements on the drawings only and not reflected to construction. That is considered as:
  20. Q20 Cradle to Cradle (C2C) certification is used to demonstrate the chemical inventory of the product and The end use product has been…
  21. Q21 Who is responsible for implementing erosion and sedimentation control (ESC)?
  22. Q22 A project architect would like to achieve a mechanically clean indoor air quality. While coordinating with MEP team, he specified one requirement…
  23. Q23 Which of the following is an economic benefit of a green building?
  24. Q24 Which of the following is not required to be tested under WE Credit Cooling Tower Water Use?
  25. Q25 An alternative compliance path for projects outside the U.S to achieve Option 2. Material Ingredient Optimization under MR Credit Building Product Disclosure…
  26. Q26 A contractor is segregating waste on-site to avoid extra costs associate with segregation outside of construction site. He dedicated an area for…
  27. Q27 Which of the following is not addressed as a requirement under IEQ Credit Daylight?
  28. Q28 To meet the EA Credit Advanced Energy Metering, Projects should Install advanced energy metering for the following:
  29. Q29 Provides frameworks that allow transparency and environmental impacts to be assessed, improved, and compared with other companies.
  30. Q30 Window tints used for solar and glare control addressed under EQ Credit Daylight may affect negatively:
  31. Q31 To achieve option 2: lighting quality under IEQ Credit Interior lighting, Projects are required to implement 4 strategies. Which of the following…
  32. Q32 During schematic design phase, the architect realized that the project is not complying with USGBC definition of ‘one building’ but the project…
  33. Q33 A LEED Administrator has some concerns over the façade material selection and U-Value calculation. He decided to submit an official inquiry. From…
  34. Q34 Project designer is having difficultly with the design as the there is no access to haulers or external facilities for waste collection…
  35. Q35 How many points the new school project can receive when 50% of student population are within the appropriate walking distance specified by…
  36. Q36 After the project received and accepted the final construction review, the LEED points were 58 point which means the project will get…
  37. Q37 For cooling towers and evaporative condensers in an office building new construction project, sustainability consultant is aiming to get two points under…
  38. Q38 Conducting a life-cycle assessment of the project’s structure and enclosure should demonstrates a minimum of 10% reduction. Project teams should select at…
  39. Q39 Projects that utilize Brownfield Remediation can earn 2 points for BD+C projects. Which of the following is Not part of the credit…
  40. Q40 A Project Credit Interpretation Ruling (CIR) process is designed to allow Project Teams to obtain technical guidance. Which of the following statements…