Question 76
Which of the following is a project risk?
-
A
A module that performs incorrect calculations due to a defect in a formula
-
B
A failed performance test
-
C
An issue with the interface between the system under test and a peripheral device
-
D
A problem with the development manager which is resulting in his rejecting all defect reports
Reveal correct answer
Correct answer: D